TXON GRP® rebar, mesh and fibre was used to repair the bridge, by removing and replacing sections that were delaminating or missing altogether. Damage to the structure was so severe that consideration was given to closing this 26 000 car per day bridge. TXON GRP® and MEDA had a solution! The Deteriorated/delaminated concrete was chipped out, and patched using a mortar/TXON GRP® fibre mix. Corroded steel rebars were removed and/or treated to inhibit further corrosion. TXON GRP® rebar was used to reprofile the failing sections to return the structure to the original design. The construction was completed for the County of Essex. The resulting use of TXON GRP® products and the unique application process resulted in a fully rehabilitated the structure with no traffic stoppages.